Michael Charrier was asked in June by the former association president, Al Canossa, to act as advisor to the board, and in July he was voted onto the board.  He did an assessment of the project and outlined the following objectives:

1.  Repair the damage and insure the buildings are structurally sound.

2.  Preserve or increase the value of our property with design changes.

3.  Design for maintenance-free buildings to save on future maintenance expenditures.

 

With that in mind the board agreed to the following:

1. Replace the existing siding and fake "stucco" with Hardiplank siding, a cement board siding.

2. Re-design all entranceways to conform to current building codes and to enhance the buildings.

3. Re-design all balconies to conform to current building codes and to enhance the buildings.

4. Enhance the design of Vantage Point to be updated as the newer buildings currently being built at Stratton.  This will be accomplished in the siding project which includes the roof line, overhangs and all trim details.