Roof Replacement & Repair

 

In 2009 Building # 3 underwent the roof replacement & repair The Project consisted of removing the existing roof & damaged sheathing.  Also repair to the roof truss system where necessary, repair to the fire walls and the damaged roof sheathing.  An engineered roof system is then installed.  The new roof system consist of an underlayment of snow and ice shield around the perimeter of the roof & in all the valleys, then a metal ice belt is installed on the lower portion of the main roof.  On the upper level of the roof  Architectural 40 year shingles are installed with a ridge vent and cap. This type of roof is used mainly in cold areas where ice and snow can build up.   You can see the roof on building #3, it has held up very well and there are no evidence of any leaks and it is moisture free due to the continuous venting system.

 

The Roof replacement for building #1  Has begun on 11/ 1/11  for progress Photos click

Building #3 Roof - completed 2009

Roof Repair - Building #3

Progress Photos - Building #1